Search Building Permits
2,835 permits · HVAC · NY
Install new direct vents for gas-fired boiler as per plans. filing to address violations 39060923x, 39060929r, 39060933j, 39060927n, & 39060926l.no change in use, occupancy, or egress.
Gas connection to three (3) replacement gas boilers.
Modifications of the existing HVAC system and associated ducts & piping on the 46th Floor, as per plans. No change to use, egress, or occupancy.
Installation of new boiler on the second floor in conjunction with approved gc #b01204531-i1
New boiler room
Installation of new hvac system associated with nb application filed under initial filing
Installation of new hvac system associated with nb application filed under initial filing
Replace two boilers.
Replace three boilers.
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in cellar; no change in use,...
Converting oil fired burner to dual fuel burner to the existing boiler located in the cellar as per plans filed herewith.
Installation of new hvac system associated with nb application filed under initial filing
Interior fit-out of existing residential(floor 1) unit 1g proposed. remove and install non-bearing partitions, install mini-split air conditioning unit. no change of use and occupancy under this appli...
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW 3-PC BATHROOM iN CELLAR AND 1ST FLOOR; NEW BOILER AND HOT WATER HEATER IN CELLAR; NO CHAN...
New 6 low pressure gas line from meter to boilers. new gas trains. no change in means of egress use group or occupancy.
Install one mini split hvac unit for heating and cooling. install bathroom exhaust fan. no change to use, occupancy or egress. related gc job #b00954109-i1, related pl job #b00954109-s2, st job #b0095...
Duct work for existing hvac system for medical office on 7th fl as per plans filed herewith. no change to use, egress or occupancy.
Replacement (2) new hot water low pressure boiler. replacement (2) new combination gas/oil burners. no change in means of egress use group or occupancy.
Proposed mechanical, HVAC subsequence to NB
File plumbing work to cap/remove oil tank, oil boiler, install new gas boiler, and storage tank as per plan. no change in use, egress or occupancy.