Search Building Permits
2,835 permits · HVAC · NY
Proposed interior renovation of cellar, 1st & 2nd floor of existing 2 story building. new hvac, construction work as per plan, partition, flooring, ceiling and painting throughout. no change in egress...
Modifications of the existing HVAC system and associated ducts & piping on the 47th Floor, as per plans. No change to use, egress, or occupancy.
Modifications of the existing HVAC system and associated ducts & piping on the 45th Floor, as per plans. No change to use, egress, or occupancy.
Herewith filing boiler work as per plans. no change in use, egress or occupancy
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
Install new boiler and h.w.h. in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
File boiler work to install new gas boiler as per plan. no change in use, egress or occupancy.
NYCHA Sumner BOILER-BLDG #13- Architectural work being filed for interior repair to existing Mechanical room correspondent to the Sumner BL Houses Project
Plumbing application to install plumbing fixtures in a 3 story mixed use buiding. -installation of 1 bfpa as per dep approval(#25103530) on 001. -installation of 1 electric water heater in cellar boil...
Abandon 20,000 gallon fuel oil tank.
Replacement of boilers and associated controls, combustion air, and flue.
subsequent filing for HVAC with duct works.
File job to address open ecb violations # 39133703z,39133704k, 39133699p, 39133697l, 39133696j, 39133698n, & vacant order # 4983343, restore the building back to twofamily house along and install 2 bo...
Fuel Storage Work type filed in conjunction with NB #B00709512-I1.
Plans and documents filed herewith for installation of gas-fired boiler
Removal of HVAC systems to satisfy violation #34455707X
Cnvrt steam equip to gas fired equip. rmve exist steam boiler, supply//return pipes, clg mntd space heaters, exist gas pipes, valves, cntrols, flues, rmve exist equip, etc. new gas fired clg mnted spa...
Removal of all existing HVAC systems and ductwork/piping as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification of existing duct ventilation system only for existing hvac units installed on site and new toilet exhaust fans as per plan. no change to use, egress or occupancy.
Gut renovation including demolition and removal of existing mechanical equipment, air handlers, boiler, flues, oil tank, radiators piping and ductwork.