Search Building Permits
2,835 permits · HVAC · NY
Install gas boiler.
Herewith filing for the installation of a new fuel storage tank in connection with the emergency generator for the new building.
New Condensing Boiler Hot water plant with pumped distribution
File job to address open ecb violations # 39133703z,39133704k, 39133699p, 39133697l, 39133696j, 39133698n, & vacant order # 4983343, restore the building back to twofamily house along and install 2 bo...
The work consists of demolition of existing heating elements and installation of new hvac & bathroom exhaust system & ductwork for bronx river house as shown on the plan. no change in use or egress un...
Modification of existing duct ventilation system only for existing hvac units installed on site and new toilet exhaust fans as per plan. no change to use, egress or occupancy.
Removal of all existing HVAC systems and ductwork/piping as per plans filed herewith. No change in use, egress or occupancy under this application.
Application filed to install new split hvac system in existing building in response to ecb violation #39143356m. all as per plans filed herewith.
Filing for installation of hvac unit for apartment 17r as per plans submitted herewith.
8939- Herewith filing for Replacement and modifications to existing HVAC system serving an existing retail space. No change in egress use or occupancy. Procert Requested.
Modifications to existing HVAC system and related piping for 3rd & 4th floor existing office suites. No change in use, egress or occupancy.
Replacement of boilers and associated controls, combustion air, and flue.
Installation of new hvac system associated with nb application filed under initial filing
Modifications to the existing HVAC system on the 1st, Mezz and 2nd floors (Harry Winston - Retail) as per plans. No change to use, egress or occupancy
Replace boiler and gas/oil burner.
Fuel Storage Work type filed in conjunction with NB #B00709512-I1.
Install new gas meter and piping to new boiler and kitchen appliances.
subsequent filing for HVAC with duct works.
Renovate existing part 1st floor commercial space for a new eating & drinking place for 'sonic'. install non load-bearing partitions, exterior wall finish, plumbing, kitchen equip, hood, exhaust & rep...
Cnvrt steam equip to gas fired equip. rmve exist steam boiler, supply//return pipes, clg mntd space heaters, exist gas pipes, valves, cntrols, flues, rmve exist equip, etc. new gas fired clg mnted spa...