Search Building Permits
2,835 permits · HVAC · NY
Boiler building facade reconstruction.
Replace boiler.
Hereby filing to replace steam boiler with direct vent boilers. connect replacement gas-fired boilers to gas piping as per plans. no change in use, occupancy or egress.
Plumbing work related to boiler replacement. no change to use, egress, or occupancy.
RENOVATION OF EXISTING CELLAR WITH PLUMBING WORK AS PER PLAN: REPLACE WASHER, DRYER AND BATHROOM; NEW (4)COMBI. BOILERS AND (1)HOT WATER HEATERS iN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER...
Replace gas booster for the boiler.
Mechanical work in conjunction with renovation of 18-story nycha multiple dwelling throughout: installation of new air-conditioning systems, replacement of ventilation systems and miscellanceous hvac...
Remove existing computer room air conditioning unit, condensate pump, drip pan, and all supports.remove existing chilled water heat exchanger, pumps, expansion tank, air separator, and chemical feeder...
Replace existing boiler & hot water tank and install two new cobi boiler with related plumbing work in existing two-family doweling units to comply ecb#39115501l. no change use egress and occupancy.
Proposed installation of air conditioner system as per plan. no change in use, egress or occupancyunder this application.
File boiler equipment work type to register 6 combination unit as per plan in conjunction with plumbing work#b01345079-s1 as per plan no change of use, egress, or certificate of occupancy.
Replace three ton split air conditioning system.
The scope of work re-using the existing hvac system and re-balance all the existing air terminals for the space. no change in use, egress or occupancy.
Application file to interior renovation as sheetrock, floor tiles, ceiling, boiler room enclose and meter room repair by cmu block at cellar. remodeling steps at rear yard at cellar floor. remove viol...
Proposed filing for Boiler Replacement.
Install new hvac split system as per plans.no change in use, occupancy, or egress.
Install new (2)boilers and (2)hot water heaters in basement as per plan; no change in use, egress or occupancy under this application.
NYU - Infrastructure Package - INSTALLATION LOCATION OF BOILERS, BOILER CALCULATIONS, SCHEDULES, DETAILS AND CONTROLS.
HVAC modifications and associated ductwork and related finishes (Public Areas - Sheraton) as per plans. There will be no change in use, egress, or occupancy.
New Heating Systems, Ventilation Systems, Air Conditioning Systems and Associated Ducts and Piping to accommodate Arch Plans.