Search Building Permits
2,860 permits · HVAC · NY
Mechanical work in conjunction with renovation of 18-story nycha multiple dwelling throughout: installation of new air-conditioning systems, replacement of ventilation systems and miscellanceous hvac...
HVAC modifications and associated ductwork and related finishes (Public Areas - Sheraton) as per plans. There will be no change in use, egress, or occupancy.
New Heating Systems, Ventilation Systems, Air Conditioning Systems and Associated Ducts and Piping to accommodate Arch Plans.
Installation of mechanical hvac systems including heating & cooling equipment, ventilation duct work & fans, and mechanical piping.
Replace existing boiler & hot water tank and install two new cobi boiler with related plumbing work in existing two-family doweling units to comply ecb#39115501l. no change use egress and occupancy.
Install (1) new HVAC split unit at first floor read one story area. No change in occupancy, use or egress or bulk under mechanical application.
Installation of one (1) new gas boiler. all work as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing work associated with Boiler replacement as per plans filed herewith. No change in use, egress or occupancy.
Application file to exist. chimney remove and replace new double wall stainlesssteel exterior chimney from basement-boiler room to be extended 4 feet above parapet wall as per plan. hpd omo#no change...
Application being filed to install 2 new cassette air handlers and a new hvac unit at 2nd floor, and to install 3 new condensers.
Proposed interior renovation for a nail spa and installation of nail ventilation system and air conditioner system in unit#601,#603 on the sixth floor as per plan. no change in use, egress oroccupancy...
In cellar remove 1 existing boiler & hwh, replace wiith 3 boilers and 3 hwh using approx.100ft.of 1''& 30 ft.of 3/4''black pipe.will upgrade 3 existing gas meter bars,all equipment vents thru existing...
3 new gas boilers in conjunction with nb m00798756-i1
Plumbing work related to boiler replacement. no change in use, egress, or occupancy.
Modifications to the existing HVAC System and relocation of ductwork on the 7th Floor as per plans (Hines - Demising Wall.) No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 31st - 33rd Floors, as per plans. No change to use, egress, or occupancy.
Complete HVAC system replacement. Existing gas fired RTU's to be replaced with DOAS/VRF HVAC system. DOAS to be air source heat pump with backup electric heat. VRF system to be split system with air s...
Nycha boiler - removal and replacement of vacuum pump unit, condensate return unit with mechanical piping and duct-work for interior renovation of mechanical equipmentroom.
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new combi. boiler on 2nd floor;new 2-pc restroom, washer, dryer, combi. boiler and hot water...
Install split system air conditioning units.