Search Building Permits
2,860 permits · HVAC · NY
Modification to HVAC system as per plans filed herewith.
Installation of 2 ton air conditioning unit on the 7th Floor. No change in use egress and occupancy.
Herewith filing to refurbish existing chillers, replace condensor water piping and upgrade the HVAC controls as per the drawings. No change in use, egress or occupancy.
Nycha boiler - removal and replacement of plumbing fixtures and associated piping for interior renovation of mechanical equipment room.
Plumbing for new boiler and water heater in cellar
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Proposing Installation of (2) 10 ton indoor air systems, ductwork, and associated apparatus, remote Condensing Units for refrigeration & ice mach.,,, Pollution control exhaust unit, Exhaust Fans , Gas...
Proposing Installation of (2) 10 ton indoor air systems, ductwork, and associated apparatus, remote Condensing Units for refrigeration & ice mach.,,, Pollution control exhaust unit, Exhaust Fans , Gas...
Installation of one (1) new gas boiler. all work as per plans filed herewith. no change in use, egress, or occupancy.
Modifications to the existing HVAC System and relocation of ductwork on the 7th Floor as per plans (Hines - Demising Wall.) No change to use, egress or occupancy.
In cellar remove 1 existing boiler & hwh, replace wiith 3 boilers and 3 hwh using approx.100ft.of 1''& 30 ft.of 3/4''black pipe.will upgrade 3 existing gas meter bars,all equipment vents thru existing...
Proposed interior renovation for a nail spa and installation of nail ventilation system and air conditioner system in unit#601,#603 on the sixth floor as per plan. no change in use, egress oroccupancy...
Modifications to the existing HVAC system on the 31st - 33rd Floors, as per plans. No change to use, egress, or occupancy.
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new combi. boiler on 2nd floor;new 2-pc restroom, washer, dryer, combi. boiler and hot water...
Install split system air conditioning units.
Application being filed to install 2 new cassette air handlers and a new hvac unit at 2nd floor, and to install 3 new condensers.
2 new gas boilers and decommissioning of 1 ex. oil boiler , no change to use egress or occupancy
Installation of 2 ton air conditioning unit on the 7th Floor. No change in use egress and occupancy.
3 new gas boilers in conjunction with nb m00798756-i1
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.