Search Building Permits
2,860 permits · HVAC · NY
Application file to exist. chimney remove and replace new double wall stainlesssteel exterior chimney from basement-boiler room to be extended 4 feet above parapet wall as per plan. hpd omo#no change...
Plumbing work associated with Boiler replacement as per plans filed herewith. No change in use, egress or occupancy.
Plumbing work related to boiler replacement. no change in use, egress, or occupancy.
Modification to HVAC system as per plans filed herewith.
Complete HVAC system replacement. Existing gas fired RTU's to be replaced with DOAS/VRF HVAC system. DOAS to be air source heat pump with backup electric heat. VRF system to be split system with air s...
Plumbing for new boiler and water heater in cellar
Herewith filing to refurbish existing chillers, replace condensor water piping and upgrade the HVAC controls as per the drawings. No change in use, egress or occupancy.
Nycha boiler - removal and replacement of vacuum pump unit, condensate return unit with mechanical piping and duct-work for interior renovation of mechanical equipmentroom.
Nycha boiler - removal and replacement of plumbing fixtures and associated piping for interior renovation of mechanical equipment room.
Abandon existing buried 8,000-gallon fuel oil storage tank as per plans. no change in use, egress or occupancy.
Install new gas boiler
Restore gas service, repair riser, register furnace.
Direct replacement of all plumbing fixtures and 3 boilers. no change in use, egress or occupancy.
Associated mechanical work for replacement of three (3) boilers and three (3) gas/oil burners as per plans. no change in use, egress or occupancy.
Boiler filing design includes the removal of (1) existing boiler and the installation of 1 new high efficiency boiler with exhaust and combustion ventilation air piping. no change in use, egress, or o...
Replace gas burner on existing boiler.
Modifications to existing HVAC system as per plans filed herewith. No change to use, egress or occupancy under this application.
Direct replacement of 3 gas boilers filing no change under use, egress or occupancy.
Replace existing three domestic hot water boilers and storage tanks with three domestic hot water heaters and five domestic hot water storage tanks. connect to existing gas piping. no change in use, e...
Application is being filed for basement floor interior renovation, install boiler, h.w.t, laundry and convert two to three fixture bathroom in basement for accessory use. no change use, egress, occupa...