Search Building Permits
2,840 permits · HVAC · NY
Modification/addition to existing HVAC ductwork and related piping as shown on drawings. No change in use, egress or occupancy.
Plumbing work on cellar of existing mixed use building with cap/remove hot water boiler and install hot water heater. no change in use, egress or occupancy.
Filing to change from oil to gas and install replace boilers and water heaters
Hvac plan in conjunction with alteration to existing one family dwelling.
1. repair boiler room floor and provide new finish flooring. repoint interior masonry wall. patch plaster at ceiling. 2.patch and repair exist. plaster ceiling on first floor. 3. remove window pane at...
Replace left hand boiler and gas burner (boiler no. 1)
Replacement of existing wall a/c units with new ductless air conditioning systems. no change in use, occupancy, or egress.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Installation of HVAC units proposed for Castle Hill Library. No change to use, occupancy or egress.
NYCHA Sumner BOILER-BLDG #13- Structural work being filed for interior repair to existing Mechanical room correspondent to the Sumner BL Houses Project.
Legalize 2 low pressure boilers serving the 1st floor commercial space and the 1st floor residential apt. cap + remove boiler lpb-1 and remove from the required boiler inspection log. no change to use...
Replace LP gas fired HW boiler
INSTALL REPLACEMENT 2,500-GALLON FUEL OIL STORAGE TANK IN CELLAR AS PER PLANS. REMOVE EXISTING 4,000-GALLON FUEL OIL STORAGE TANK. FILED IN CONJUNCTION WITH LAA APPLICATION No. M01312797-I1-LA.NO CHAN...
NYCHA Sumner BOILER-BLDG #13- Civil work being filed for repair to existing Mechanical room correspondent to the Sumner BL Houses Project.
Hvac work for lobby renovation as per the plans filed herewith. no change to use, egress or occupancy.
Replace existing gas boiler and piping, plumbing works as per plan, no change in egress, use, or occupancy.
Mechanical work for installation of two gas furnaces, gas piping filed under dob now #b01317311-i1.
Installation of new Boiler system, HVAC System and Make up air unit for existing House of Worship. No change of use, egress or occupancy under this application. See comment#24
Installation of new hvac system associated with nb application filed under initial filing
Installation of two new gas furnaces, one new hot water heater in cellar, and associated piping. no change in use, occupancy, or means of egress