Search Building Permits
2,860 permits · HVAC · NY
Mechanical work for installation of two gas furnaces, gas piping filed under dob now #b01317311-i1.
Application for mechanical (hvac) work in conjunction with alteration-1 change of use/occupancy, vertical enlargement, and interior/exterior renovation.
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc.
NYCHA Sumner BOILER Bldg #10 - Replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters
Installation of new hvac system associated with nb application filed under initial filing
Modifications to the existing HVAC system on the Cellar floor (Harry Winston - Cellar Fitout) as per plans. No change to use, egress or occupancy.
Installation of new hvac system associated with nb application filed under initial filing
Replace HVAC unit for Chase Bank. No change to use, egress or occupancy.
Installation of new Boiler system, HVAC System and Make up air unit for existing House of Worship. No change of use, egress or occupancy under this application. See comment#24
Installation of two new gas furnaces, one new hot water heater in cellar, and associated piping. no change in use, occupancy, or means of egress
Replace HVAC unit for Chase Bank. No change to use, egress or occupancy.
Mechanical work for installation of two gas furnaces, gas piping filed under dob now #b01317311-i1.
NYCHA Sumner BOILER Bldg #10 - Replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters
Mechanical modifications in boiler room for alteration of existing boiler combustion air as per plans filed herewith. no change in use, egress or occupancy.
Modifications to the existing HVAC system on the Cellar floor (Harry Winston - Cellar Fitout) as per plans. No change to use, egress or occupancy.
Replace existing gas boiler and piping, plumbing works as per plan, no change in egress, use, or occupancy.
Application for mechanical (hvac) work in conjunction with alteration-1 change of use/occupancy, vertical enlargement, and interior/exterior renovation.
Installation of new hvac system associated with nb application filed under initial filing
Installation of new hvac system associated with nb application filed under initial filing
East Midtown Plaza Bldg F, exterior FISP Cycle 9 related facade repairs as per the plans filed including: Concrete spall and wall air conditioner sleeves repairs. Sheet metal replacement at sills. Loc...