Search Building Permits
3,477 permits · Demolition
Renovation of an existing apartment # 11E and the 11th Floor. Work includes non-structural demolition, general construction and mechanical.
Renovation of an existing apartment # 11E and the 11th Floor. Work includes non-structural demolition, general construction and mechanical.
Plywood construction fence in conjunction with new building and demolition work.
This job is filed for full demolition work at 1532 bergen street, brooklyn, ny 11213
Total demo of SFR 1928 sq ft circa 1964 Total demo of garage 1152 sq ft circa 1964 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requiremen...
Total Demo of SFR 1050 sqft circa 1935
COMPLY WITH DEPARTMENT ORDER effective date01/10/2026. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATEDemolish (e) family dwelling, beauty shop, and ice cream parlor
Interior demolition of non load bearing partitions on the 3rd floor, 23rd floor construction (24th floor marketing) and 24th floor construction (25th floor marketing) as indicated on drawings.
Renovation of an existing apartment # 11E and the 11th Floor. Work includes non-structural demolition, general construction and mechanical.
Demolishing existing SFD. SEWER CAP REQ.
Demolish existing Church and School, which has been deemed a Present, Imminent, Extreme, and Immediate Hazard (PIEIH) per LABC Section 8905.1
Demolition of (e) detached garage.
Minor interior demolition: Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the Ground Floor as per plans (Hines - Retail Demo for Gregory's Coffee.) No change to us...
Demolish existing single-family dwelling per plan.
Spr 2019 cbrc: partial demolition of existing asphalt parking lot serving 1-story brick motor vehicle repair shop (no work to existing building). existing metal fence and metal gate to remain. the pro...
Full hand demolition of a 2 1/2 story building using handheld devices. foundation to be removed using mechanical means
General construction and partial demolition of the Rockefeller Research Lab (Pavilion Enabling) parking garage as per plans filed herewith. No change in use or occupancy under this application. Existi...
Demolish (e) DuplexCOMPLY WITH DEPARTMENT ORDER effective date 01/10/2026. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE. If additional assistance is needed, please call Inspector JAIME RIOS at (213)2...
Demolition of an administration and custodial care facility approximately 41000 square feet (Circa 2011). 2024 143390 SP - Approved ...
Eplan: demo (e) carport for (n) adu