Search Building Permits
3,481 permits · Demolition
Structural demolition and phasing associated with elevator shaft work.
Respectfully filing for sprinkler work which includes: demolition of existing limited area sprinkler system installation of new limited area sprinkler system.
full demolition of 14 story structure using hand held and mechanical means to assist
Hand demolition of existing garage
full demolition of one story structure using hand held and mechanical to assist.
General construction including demolition of non-bearing interior partitions and finishes and new finishing work, as shown on plans filed herewith. No change in use, egress, or occupancy.
Application is filed for the reconstruction of a previously demolished non-conforming & non-complying 2-family, 2-story with cellar building. As per ZR 54-41 & ZRD1 dated 07/18/2024 a new Certificate...
Application is filed for the reconstruction of a previously demolished non-conforming & non-complying 2-family, 2-story with cellar building. As per ZR 54-41 & ZRD1 dated 07/18/2024 a new Certificate...
Full demolition to a one story building
Proposed to cut, cap and demolish sprinkler system in conjunction with full demo job # m01249911. no change to use, egress or occupancy under this application.
Mechanical means, submitted for use of mechanical equipment on grade, at the time of demolition
Full demolition to a two story building
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (23rd Floor-Orrick-Buildout) as per plans. No change to use, egress or occupancy.
Renovation of residential lobby. Minor demolition and carpentry. No change in use, occupancy or egress.
Demolition of detached house. On-site and off-site fill not to exceed 300 cubic yards.
Int demolish
Demolish exisiting storage room and garage
Full demolition of a 1-story stucco and frame.
Interior demolition on existing 2-family, two (2) story brick residential building with basement.no change of building bulk, occupancy or egress
chute will be installed in accordance with approved demolition plans. Mechanical means equipment to be used in accordance with approved demolition plans.