Search Building Permits
3,481 permits · Demolition
Full demolition
Demolish interior
Prop. remediation work to extension constructed w/out permit as per ECB# 39104125N. Partial interior demolition of non-load bearing partitions at Cellar. Construction/Structural work to be modified fo...
full demolition of 14 story structure using hand held and mechanical means to assist
ePlan: Interior Early start Demolition.
Demolish existing single family dwelling and existing garage accessory structure per plan.
chute will be installed in accordance with approved demolition plans. Mechanical means equipment to be used in accordance with approved demolition plans.
Construct alterations to existing one family dwelling demolish existing and construct new detached garage subject to field inspection [STFI].
Propose interior demolition of finishes & partition works as per plan of existing building. no change in use, egress, or occupancy under this filing.
Application is filed for the reconstruction of a previously demolished non-conforming & non-complying 2-family, 2-story with cellar building. As per ZR 54-41 & ZRD1 dated 07/18/2024 a new Certificate...
Total Demo of Manufactured home 1020 sqft circa 2012
Proposed demolition of (e) 1-story 120' x 776' warehouse bldg.
Prop. remediation work to extension constructed w/out permit as per ECB# 39104125N. Partial interior demolition of non-load bearing partitions at Cellar. Construction/Structural work to be modified fo...
Respectfully filing for sprinkler work which includes: demolition of existing limited area sprinkler system installation of new limited area sprinkler system.
Interior demolition work associated with main application #Q0117857; removal of partitions, floor finish and ceiling finish.
Interior non-structural demolition sectors 142 143 146 147_ levels 4
Proposed to cut, cap and demolish sprinkler system in conjunction with full demo job # m01249911. no change to use, egress or occupancy under this application.
Mechanical means, submitted for use of mechanical equipment on grade, at the time of demolition
Interior demolition on existing 2-family, two (2) story brick residential building with basement.no change of building bulk, occupancy or egress
ePlan: Demolish existing detached garage.