Search Building Permits
3,460 permits · Demolition
ePlan: Demolish detached garage, pedestrian protection fence required
Spr 2019 chicago rehabilitation code title 14r w/ april 2022 supplements: interior and exterior renovation and alteration work at the existing united airlines cargo facility warehouse, building 630 (o...
Demolition of structure using Cat 320, 345 excavator or equivalent with demo attachments, and Bobcat S300 skid steer
Early start demolition of floor levels #14 & #21 of non structural walls, flooring, ceiling and finishes.
Demolition of structure using Cat 320, 345 excavator or equivalent with demo attachments, and Bobcat S300 skid steer
Demolish two-family dwelling per plan. Includes removal of (1) accessory structure (garage).
Temporary bracing of remaining brick wall after full demolition
Eplan. Supplemental to permit# 24016-10000-23993 for demolition of existing concrete slab and replace with new concrete slab.
Removal of the brick facade on the second level that is at risk of falling onto the sidewalk at 4146 Fremont Ave N. No other demolition work authorized with the issuance of this permit.
levels 3-11: demolition of non-structural walls & ceilings, and installtion of new finishes. new ceilings & new lighting in elevator lobbies.
Full Demolition - FOR THE COMPLETE DEMOLITION OF EXISTING BUILDING ON THE LOT.
Full Demolition - FOR COMPLETE DEMOLITION OF EXISTING STRUCTURE FOR USE AS A VACANT LOT.
Full Demolition - FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURE FOR USE AS A VACANT LOT.
Full Demolition - FOR THE COMPLETE DEMOLITION OF ALL STRUCTURES ON THE LOT.
suite 145: demolition of concrete wall in front of glass wall. removal of wall mounted cameras and clocks. removal of fcu's above ceilings etc. ab-017 exception to requirements for disabled access to...
demolish a two-story, type 5, single family building.
Minor Demolition - *MAKE SAFE PERMIT** FOR THE COMPLETE DEMOLITION OF THE EXISTING TWO (2) STORY BUILDING TO COMPLY WITH VIOLATION CASE # CF-2025-130805. DEMOLITION TO BE DONE BY HAND AND WITH HAND TO...
Filing herewith interior demolition in cellar unit 1B bathroom as per plans filed herewith. No change to use, egress or occupancy.
Install temporary wood construction fence for demolition operations.
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 18th and 19th floors (TD Securities- Marketing Floors 19 & 20) as per plans. No change to use, egress or occup...