Search Building Permits
4,786 permits · New Construction
Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per drawings during new building work. sidewalk shed and pipe scaffold to comply with chapter 33 of the nyc building code of...
Installation of temporary construction fence for new buildings at 346 and 348 pacific avenue.
New 3-story townhome condominium residential building with six units. Unit 401 with (3) bedrooms (3.5) bathrooms attached garage loft and covered patios.
Errect new building, 3-story with cellar and 3-family. filing includes mechanical and structural works per approved plans
remodel entire interior of the property reconfigure laundry room replace interior and exterior doors replace windows reconfigure master bathroom install new flooring new drywall in areas as needed
Single #6000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator applic...
ePlan: BAUS - Airport Project: Installation of a temporary hanging scaffold system to limit impacts to the existing bagging claim level of the AUS Barbara Jordan Terminal during construction.
Foundation filing in conjunction with new building application 321980969.
New 3-story townhouse condominium residential building with three units. Unit 108 with (2) bedrooms (2.5) bathrooms attached garage attached carport storage room attic and covered patios.
PAA for Structural Work in conjunction with New Building
Filed herewith plans and application for a new temporary plywood construction fence filed in conjunction with new building on lot 15.
Propose support of excavation involves excavation, new retaining walls in conjunction with NB application. No change of Occupancy, Use and Egress.
Soe specifications filed in conjunction with nb application #x01220923-i1.
New Construction - FOR THE INSTALLATION OF AN AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT A SINGLE-FAMILY DWELLING SERVED BY A ONE (1) INCH COMBINED DOMESTIC AND FIRE SERVICE LINE. ALL WORK TO BE DONE P...
New Construction - FOR THE INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D THROUGHOUT THREE STORY BUILDING TO INCLUDE 1-INCH COMBINED WATER SERVICE LINE AS PER APPROVE...
New Construction - FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. (UNDERPINNING NOT A PART OF THIS PERMIT)...
New construction ac
New construction, addition, GFA change - For the erection of an addition with a roof deck and roof deck access structure to an existing attached structure. Size and location as shown on plans.
EPLANNew construction detached ADU at rear of lot (18'1" x 47') per CA Govt. Code 65852.2(e)(1)(B) and applicable part of LAMC 12.22 A.33 (c)-(d), (g) (800 SF max new construction).
New construction, addition, GFA change - FOR THE ERECTION OF A NEW TWO (2) STORY ATTACHED STRUCTURE WITH CELLAR. TO BE USED AS A SINGLE-FAMILY DWELLING. SIZE AND LOCATION AS SHOWN ON THE APPLICATION/P...