Search Building Permits
3,418 permits · Demolition
DEMOLITION FOR DETACHED GARAGE BY HANDWRECK METHOD. Sewer Cap Not Required.
Total demo of pool 525 sqft
full demolition of existing one story building.
Demolish (e) detached 1-car garage
Demolition of the (e) storage (shed).
Eplan REMOVAL OF 52'-6"' MONOPOLE AND ANTENNA EQUIPMENTS REMOVAL OF EXISTING BOLLARDS, H-FRAMES W/ EQUIPMENT, EQUIPMENT CABINETS, 6'-0"X20'-0" CONCRETE PAD, METAL FENCING AND FENCE POSTS. EXISTING 2'-...
Full demolition to a two story building
Interior demolition of non load bearing partitions on the 25th floor, north side as indicated on drawings.
Spr 2019 cbrc: interior demolition to an existing office on the 28th floor per plans. (occupancy group b construction type 1a)
Removal / demolition of existing athletic fields in conjunction with athletic field renovation. provide new fencing, walls, pavts, site improvements, synthetic turf field, resilient surface track and...
Full demolition to a one story building
Eplan: demo of existing detached garage. sewer cap required.
Filed Herewith; 8-Foot-High Temporary Plywood Construction Fence in conjunction with Demolition Application #B01319720-I1
Dds 2019 cbrc: interior demolition of non load bearing partitions at existing 1 story warehouse (occupancy b- business f-1 warehouse; construction type iiib) consultant reviewer: v3 companies of il
Wreck and remove a 2 story frame multi unit residence previously demolished without a permit. detached frame garage also to be demolished.
Renovation of an existing apartment# 3E on the 3rd floor. Work includes non-structural demolition on the third floor.
Full demolition
Full demolition of two story building.
Interior demolition of non-bearing walls, ceilings, floors, and doors to prepare the space for new construction. No change in use, egress, or occupancy.
Construction fence application being filed for demolition and new building