Search Building Permits
3,450 permits · Demolition
Non-Structural Demolition Sectors 142143146147 levels 2
Filing for demolition work as per plans. full hand demolition of a fully detached 2 family home
Interior demolition of non-bearing walls, ceilings, floors, and doors to prepare the space for new construction. No change in use, egress, or occupancy.
Dds 2019 cbrc: interior demolition of non load bearing partitions at existing 1 story warehouse (occupancy b- business f-1 warehouse; construction type iiib) consultant reviewer: v3 companies of il
Interior demolition of non load bearing partitions on the 25th floor, north side as indicated on drawings.
Demolition of the (e) storage (shed).
Total demo of pool 525 sqft
Filed Herewith; 8-Foot-High Temporary Plywood Construction Fence in conjunction with Demolition Application #B01319720-I1
Full Demolition - Complete demolition to create vacant lot
interior renovation, including the demolition of selected existing elements and a new interior layout. scope also includes limited modifications to certain facade elements as required by the design.
40/f suite 4000: interior tenant improvement. demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtur...
20/f suite 2000: interior tenant improvement - demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtu...
38/f suite 3800: interior tenant improvement. demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtur...
City Demolition - Sub Demolition Permit for CF-2025-022077. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No sidewalk. (2) stucco c/w 4...
Partial demolition to existing 1 story & cellar building; proposed vertical and horizontal enlargement; alteration to meet new building requirements with existing elements to remain. conversion to two...
full demolition of existing one story building.
Demolish elec
General Demolition and construction related to the renovation of 6 science rooms.
Rebuilt east garage wall as per plans. demolish & rebuilt south garage party wall as per plansc.repair north party walld.resolve oath/ecb violation no. 39160646pe.resolve dob violations:e.a.v 091625c2...
Full demolition to a three story house