Search Building Permits
4,823 permits · New Construction
architectural plans filed for NEW building, ONE-STORY COMFORT STATIONTO BE LOCATED IN NAMEOKE PARK.
Filing structural work type in conjunction with nb#q00931641i1
New construction
Foundation work as per plans filed, in conjunction with NB # B00848066-I1
CONVERT EXISTING 1 STORY DETACHED GARAGE WITH ADDTION TO ADU PER WFPP (Ordinance ADU, New Construction,or Conversion of Existing, LAMC12.22A.33(b)(1))
Fence application filed in conjunction with nb job #b01072292.
FILING HEREWITH CIVIL SITE WORK WITH TEMPORARY RESTRIPING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED UNDER MPP Project-000000254 AND NB# Q01274555.
Herewith filing fo-ea design plans for 6-sty nb with proposed underpinning on expo-2 & 4. this application is filed subsequently to soe app. (filed under dob now job #b00640303-i1), and in conjunction...
Install mechanical systems in conjunction with nb. there is no change in use occupancy or egress.
Structural work for new building.
Support of Excavation work type filed in conjunction with NB application Job # B00766828-I1
Herewith filing soe design plans for a 6-sty nb with proposed 1:1 excavation along exposure-3; and steel shoring on exposure-1. this application is filed in conjunction to dob bis application with job...
Foundation work for new building.
Foundation work as per plans filed, in conjunction with NB # B00847849-I1
Installation of new automatic wet sprinkler system for new building as per nyc bc 2022, fc 2022, pc, 2022, nfpa 13 2016 as amended by nyc bc 2022 appendix q. filed in conjucntion with nb 121187820.
Installation of new automatic wet sprinkler system for new building as per nyc bc 2022, fc 2022, pc, 2022, nfpa 13 2016 as amended by nyc bc 2022 appendix q. filed in conjucntion with nb 121187820.
Equipment use: dual 7000 # capacity personnel hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator a...
Installation of single personnel/material hoists. during new building const filed sep. hoists shall comply with the 2022 bldg codes, ch #33. no change in use, occ or egress under this app elev appl fi...
Filing application for construction fencearound area of work, for site safety, subsequent to dob nb job # q01034910-i1
Foundation and earthwork specifications filed in conjunction with nb application #b01190376-i1.