Search Building Permits
3,450 permits · Demolition
Demolition over 50%, vertical and horizontal enlargement to create 2 story, 2 family dwelling.
Demolition of 2 story dwelling
Filing herewith interior demolition and renovation to the 13th FL. as per plans filed herewith. No change to use, egress occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes and sidewalk repair on the Cellar & 1st floors (Harry Winston -Fitout) as per plans. No change to use, egre...
DEMOLITION OF AN EXISTING ONE STORY COMMERCIAL GARAGE (3000SQ FT IN SIZE). SEWER CAP IS REQUIRED. PEDESTRIAN FENCE IS REQUIRED.COMPLY WITH DEPARTMENT ORDER effective date01/03/2012. PERMIT WILL EXPIRE...
Renovation of an existing apartment #8BB on the 8th Floor. Work include non-structural demolition and general construction as per plans filed herewith.
Demoliton and replacement of 1300sqft existing vaulted concrete slab sidewalk and topping slab. no change to use, egress or ocupancy
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Demo 2 story + basement wood framed house
Total De4mo of SFR 1232 sqft circa 1964
Total Demo of SFR sqft circa 1946
Non-Structural Demolition AUS27 Floor 3
Herewith, please find the filing for interior demolition, which includes the removal of partitions, ceilings, floors, and fixtures throughout. There will be no changes to use, egress, or occupancy.
Perform minor interior partition demolition & construction. reconfigure entry vestibule & sitting room. replace entry door and frame to match existing. install new lighting at entry vestibule & sittin...
eplan - demolish (e) 1-story detached garage in conjunction with (n) ADU under 25014 - 10000 - 04629
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes and sidewalk repair on the Cellar & 1st floors (Harry Winston -Fitout) as per plans. No change to use, egre...
Total Demo of SFR 1100 sqft circa 1950
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Demoliton and replacement of 1300sqft existing vaulted concrete slab sidewalk and topping slab. no change to use, egress or ocupancy
Hand Demolition of one story commercial building as per Emergency Declaration. Debris and concrete slab to be removed using Kubota KX080 Mini Excavator. Existing shallow foundation walls and footings...