Search Building Permits
4,810 permits · New Construction
New construction, addition, GFA change - New construction single-family dwelling as per approved plan NTE 38' in height. Affordable housing
mayfair building: priority mayor's ed 17-02 - erect a type 1a, 4-story, mixed-use building with 30 residential units
erect type 1a over 4a 21-story 272 unit residential/commerical building.
New Construction - FOR THE ERECTION OF AN ATTACHED THREE (3) STORY STRUCTURE OF TYPE V-B CONSTRUCTION WITH BASEMENT, ROOF DECK, AND ROOF DECK ACCESS STRUCTURE. FOR USE AS A SINGLE-FAMILY DWELLING (GRO...
New Construction - INSTALL NEW FIRE SUPPRESSION SYSTEM AND 1” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL...
New Construction - NEW CONSTRUCTION OF A FOUR (4) STORY BUILDING WITH CELLAR AND COMMON ROOF DECK WITH PILOT HOUSE ACCESS FOR USE AS A SHELL COMMERCIAL SPACE (USE REGISTRATION & FIT-OUT PERMITS REQUIR...
New Construction - FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. (UNDERPINNING NOT A PART OF THIS PERMIT)...
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Construction fence as per drawings during nb const, filed sep. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per drawings during new building work. no change in use, egress and occupancy. sidewalk shed and pipe scaffold to comply wit...
Install temporary construction fence as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB #Q08026702.
Herewith filing for fo & ea plans of 2-storey new building.the fo includes continuous concrete wall footing and underpinning at exposure-3. this job is filed in conjunction with dob job # q01027235-i1
Fence application hereby filed subsequent to the Alt-CO NB application: B01251200-I1.
Filing foundation work type in conjunction with nb job#q00931641i1
Temporary construction plywood fence filed in conjucntion with nb. q00718262.
Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per drawings during new building work. no change in use, egress and occupancy. sidewalk shed and pipe scaffold to comply wit...
Structural work as per plans filed. Subsequent filing to NB #Q08030857.
Soe specifications filed in conjunction with nb application #x01257342-i1
New building multiple dwelling
Clearing, grading, and site work no buildings included under this permit