Search Building Permits
4,787 permits · Roofing · CA
detached garage to include work for retaining wall repair located at side and roof repair as needed due to dry rot
solar permit: installing 14 solar pv modules, 410 watts per module, total no. of rating 5.74 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacit...
re-roofing no hot works.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 10 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 11 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing ( 50 ) Squares. Class A roof covering is required within Very High Fire Hazard Se...
NEW ACCESSORY DWELLING UNIT WITH ATTACHED PORCH ADDITION ATTACHED TO (E) SINGLE FAMILY DWELLING BY (N) 10'-0" COMMON ROOF PER LAMC 12.22 A.33 (c) and (e).
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___9___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VHF...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing (32 ) Squares. Class A roof covering is required within Very High Fire Hazard Sev...
First floor addition (22' x 22', 613.5 sqft) to the rear & new covered deck alson a new roof deck on the roof of the addition.
CONVERT 16'-6 1/4" X 20'-2 1/2" PORTION OF (E) GARAGE TO ADU PER GC 66323(a)(1) AND 7' X 16' ADD PATIO COVER W/ ROOFTOP DECK TO (E) SFD AT 2ND FLOOR. ALL WORK PER ENGINEERING.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 24 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 24 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 27 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 26 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
2025 wildfire rebuild, single-family dwelling with an attached garage, roof deck (2)-story. nfpa 13d sprinklers throughout
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing _35_Squares. Class A roof covering is required within Very High Fire Hazard Sever...