Search Building Permits
44,837 permits · Other
HUB consultation meeting held 6/6/25. Herewith filing for parking garage removal for Emergency Dept expansion as per plans.
Construction of new concrete 6-story building, including concrete columns, beams, and slabs, filed in conjunction with GC#B01181547-I1.
Remove and replace existing Vacuum pumps and condensate return units with new zone control valves.
Suspended scaffold for facade restoration as shown on plans
Install foundation in conjunction with alt co #b01117069-i1. no change to use egress or occupancy.
Filing herewith plans and application for a new one (1) car garage in the rear of the building. drywell filed under separate application #q01111146-s1. requesting for a new certificate of occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Proposed 6-story residential building.
An existing mixed used building with exterior work at a store front on partial of 1ST floor and to resolve violations # 39138287L. No change in use, egress or occupancy.
Mount Sinai - Hess Data Center Chilled Water Expansion Project Phase 2 - Mechanical modifications on 1st, 3rd, 9th, 11th, and 11th Floor Mezzanine as shown on plans filed herewith. No change in egress...
Reconfigure existing ductwork runs and install 2 new diffusers. re-locate thermostats.
Installation of Material Hoist.
Installation of 8' construction fence
Proposed construction fence filed herewith.
Filed for horizontal extension and conversion existing (1) family dwelling to (2) family dwelling as per plan. obtain new c.of o.
Filed for horizontal extension and conversion existing (1) family dwelling to (2) family dwelling as per plan. obtain new c.of o.
Structual work proposed.