Search Building Permits
8,827 permits · HVAC
modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
HVAC removals (Early Demo- Package 1) as per plans. No change to use, egress or occupancy.
Install new hvac system for 7 stories mix-use building with cellar subsequent with dob now#q00710146.no change of use, egress and occupancy.
Proposed air conditioning system and ducwork
Dyckman houses, installation of temporary boiler stacks, steam, condensate, make-up water piping connected to existing heating plant to provide heat during the heating season in conjunction with dob #...
Installation of Mechanical HVAC equipment, ductwork, piping, vent and exhausts related to the enlargement.
Modifications to the existing HVAC system on the Cellar & 3rd floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Nycha dyckman houses, installation of temporary gas piping to connect (3) temporary mobile boiler trailers to provide heat during the heating season. no change in use, egress, or occupancy.
Filing herewith HVAC system as per plans filed herewith.
NYCHA Boilers Dyckman: Building 3: Site/Civil work as per plans filed herewith. No change to use, egress or occupancy.
NYCHA BOILER -Dyckman: Building 8 Boiler replacement as per plans filed herewith,
NYCHA BOILER -Dyckman: Building 5.Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues and Boilers
Ps 143m, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler and provide heat to the building. no change in use, egress, or occupancy.
Lehman village boiler upgrade, structural modifications as per plans. no change in use egress or occupancy.
NYCHA BOILER -Dyckman. BUILDING 5: PLUMBING WORK IN RELATION TO BOILER REPLACEMENT AS PER PLANS FILED HEREWITH
NYCHA DYCKMAN BOILERS:Building 6: Plumbing work in relation to boiler replacement as per plans filed herewith.
NYCHA BOILERS Dyckman: Building 5: Site/Civil work in relation to boiler replacement as per plans filed herewith
NYCHA Boilers: Dyckman Building 5: Mechanical work associated with Boiler replacement as per plans filed herewith.
Modifications to the existing HVAC system on the 14th, 18th, 19th and 20th floors as per plans. No change to use, egress or occupancy.
Extend existing ductwork from basement for 2nd floor to 3rd floor with supply branches to all living spaces in 2nd and 3rd floors