Search Building Permits
9,369 permits matching "hvac"
Installation and relocation of exhaust ducts and louvre, and installation of unit heaters
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Filing for louver replacement, minor facade repair of existing masonry disturbed by louver replacement and pad extension related to boiler replacement/removal per plans filed. no change to use, egress...
Rooftop HVAC equipment condensate drain lines. Remove and replace Roof drains. Remove existing gas piping, cap into gas meter rooms. Remove and replace existing bulkhead scuppers, gutters and downspou...
Nycha east river boilers consisting of plumbing work in the cellar and 1st floor as per plans filed herewith. no change to use, egress, or occupancy.
Installation of steam unit heater for boiler replacement. no change to use, egress or occupancy.
Replacement stairs and doors of boiler plant and tank/pump rooms in kind with existing. replacement concrete equipment pads.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 ton horizontal gas system
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Addition/ interior remodel of existing 2-story single-family residential to include: 1st story addition of living room kitchen shop (external access) rear screened porch and rear covered wood deck; co...
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 5 ton horizontal gas system
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - Interior Remodel of Existing Admin Areas Phase 2.
***Timed Virtual Inspection: 04/09/2026 @ 8 AM*** Replacement of complete existing central heat and air system with or without duct work
Highland 3313 A Right New - 1 Story SFR CONDOMINUM w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 680.79 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld h...
Replacement stairs and doors of boiler plant and tank/pump rooms in kind with existing. replacement concrete equipment pads.