Search Building Permits
8,821 permits · HVAC
Spear - modification of hvac.
This application is for the construction of the new Mayflower Avenue Pumping Station Service Building which consists of site civil, structural, architectural, HVAC, electrical and plumbing work.
Replacement of complete existing central heat and air system with or without duct work Install replacement 2 Ton AC system
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4bath]. Bldg 1
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system with new HVAC system without duct work for Unit 127
HVAC removals (Early Demo- Package 1) as per plans. No change to use, egress or occupancy.
Dyckman houses, installation of temporary boiler stacks, steam, condensate, make-up water piping connected to existing heating plant to provide heat during the heating season in conjunction with dob #...
Supplemetal permit to 18010-10000-00355 to relocate the elevator machine room within the parking level.t*** - proposed location of the machine room needs to be approved by the mechanical plan checker.
Interior non-structural demolition of existing office space improvement. new non load-bearing partitions, ceilings, finishes, and interior doors. the area of work is 4,484 sf. (no change of use, occpa...
Remove and provide new split systems air conditioning units with outdoor condensing units. Replacing refrigerant piping for air handing unit. Remove and replace penthouse.
Modifications to the existing HVAC system on the Cellar & 3rd floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
NYCHA BOILERS Dyckman: Building 5: Site/Civil work in relation to boiler replacement as per plans filed herewith
Install mechanical system for HVAC heating, cooling and exhaust for renovation of existing NYCDEP govt. building as per plan. No change in occupancy.
NYCHA BOILER -Dyckman. BUILDING 5: PLUMBING WORK IN RELATION TO BOILER REPLACEMENT AS PER PLANS FILED HEREWITH
NYCHA Boilers Dyckman: Building 3: Site/Civil work as per plans filed herewith. No change to use, egress or occupancy.
NYCHA Boilers: Dyckman Building 5: Mechanical work associated with Boiler replacement as per plans filed herewith.
NYCHA DYCKMAN BOILERS:Building 6: Plumbing work in relation to boiler replacement as per plans filed herewith.
Lehman village boiler upgrade, structural modifications as per plans. no change in use egress or occupancy.
Installation of new boiler in existing mechanical room. removing old boiler not in use. no change of use egress or occupancy.
Nycha dyckman houses, installation of temporary gas piping to connect (3) temporary mobile boiler trailers to provide heat during the heating season. no change in use, egress, or occupancy.