Search Building Permits
7,089 permits · HVAC
2708al new 2 story 5 bedroom 3 bath single family residential home with attached garage covered front porch and rear patio
New 2-story 2 bedroom two bathroom dwelling unit with covered porch.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3.5 Ton Horizontal Gas System (Downstairs) LIKE FOR LIKE: 2.5 Ton Horizontal Gas System (Upstairs)...
Installation of new HVAC split system, and duct work on fire damage store
New 3-story townhouse condominium residential building with three units. Unit 106 with (2) bedrooms (2.5) bathrooms attached garage and covered patios.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 Ton Gas Horizontal System
Complete work done under previously expired permit #_22010-10000-01035_. Work is _90_% complete(Minimum 75% percent completed as determined by inspection)Including HVAC,Electrical, plumbing
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH. (Installation of new HVAC systems throughout the building and all apartments, including heating and cooling units, associated condensers, mechanical e...
Replacement of air conditioning unit in the cellar MER. All existing ductwork to remain. No change in use egress and occupancy.
Supply and install boiler pod with (6) new gas fired condensing boilers furnished with all accessories and appurtenances. no change to use, egress or occupancy.
Install new HVAC system for Bank of America.
Structural work filed for ceiling repairs and boiler room ceiling support as per plans filed. no change in use, egress or occupancy.
Direct replacement of 3 hvac on existing gas piping. no change in use, egress or occupancy.
Installation of Fuel Storage tanks for a diesel-based emergency generator.
Installation of new air conditioning system including related, somke detectors, smoke dampers, fans, ductwork, and piping.
SUPPLEMENTAL TO Complete work done under previously expired permit #_____19014-10000-02880_____. Work is ___90___% complete(Minimum 75% percent completed as determined by inspection).MECHANICAL, ELECT...
1-Kitchen 1-bathroom remodel for residential buildings (no structural changes)Including HVAC, Plumbing, Electrical
Ps 128m, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler and provide heat to the building. no change in use, egress, or occupancy.
Lehman village boiler upgrades, plumbing modifications as per plans. no change in use egress or occupancy.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton AC system with furnace and coil