Search Building Permits
7,089 permits · HVAC
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 1.5bath] Work to include: Second floor addition Interior remodel new beds new baths [6bed 3bath]...
whole home gas repipe-A riser would be ran up the exterior wall in black iron then ran through the attic to a manifold in CSST. From this manifold we would supply the HVAC closet the dryer and the wat...
ePlan: Residential Expedited Review - New construction of a TWO UNIT RES. Bldg 2 New construction of a 2-Story Single Family Res. [3bed 2.5bath] with attached Garage
Interior renovations from retail grocery to fitness center including mechanical electrical and plumbing.
Replacement of complete existing central heat and air system with or without duct work
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...
Renovation of cellar mechanical room - nycha boilers replacement. work to include: install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes.
Installation of the new concrete pads for mech. equipment in tank rooms and boiler room.create new opening in the exterior masonry walls. ew concrete area ways at tank rooms.
New Construction - INSTALLATION OF HVAC SYSTEM FOR NEW CONSTRUCTION MULTI-FAMILY BUILDING AS PER APPROVED PLANS. *2018 IMC REVIEW*
New Construction - FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNITS, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTR...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
new hvac system
Ductwork and hydronic piping for starbucks fit out
Install Furnace and AC and ductwork
Furnace & duct work
Alteration to the mechanical system to install new exterior and interior equipment, ductwork and gas piping
Minor alteration
Exhaust furl gas system heating ventilation hydronic system work assocciated with work under bda-2025-00658
Remodel existing offices - This scope includes new meeting rooms upgrades to millwork at kitchenettes and new elevator lobbies with turnstiles. Total project (Floor 2)
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton two stage vertical heat pump system