Search Building Permits
7,506 permits matching "hvac"
NYCHA Boilers Dyckman: Building 3: Site/Civil work as per plans filed herewith. No change to use, egress or occupancy.
Installation of mechancial ventilation, exhaust systems and refrigeration systems for convenience store.
NYCHA Boilers: Dyckman Building 5: Mechanical work associated with Boiler replacement as per plans filed herewith.
NYCHA DYCKMAN BOILERS:Building 6: Plumbing work in relation to boiler replacement as per plans filed herewith.
NYCHA BOILER -Dyckman: Building 8 Boiler replacement as per plans filed herewith,
Installation of new steel dunnage on new roof for new HVAC units.
Installation of new boiler in existing mechanical room. removing old boiler not in use. no change of use egress or occupancy.
Propose to install new boilers for the new building.
Dyckman houses, installation of temporary boiler stacks, steam, condensate, make-up water piping connected to existing heating plant to provide heat during the heating season in conjunction with dob #...
Nycha dyckman houses, installation of temporary gas piping to connect (3) temporary mobile boiler trailers to provide heat during the heating season. no change in use, egress, or occupancy.
Proposed air conditioning system and ducwork
Replacement of existing steam to hot water heat exchanger skid system; building footprint remains unchanged.
Interior Office Remodeling no envelope work no warehouse
Core & shell remodel (non-structural) of an existing type II-B non-sprinklered building. Adding new demising wall to create two tenant spaces. (Bldg. F Unit F-1 and Unit F-2)
Change of a portion a retail to restaurant and added it to the adjacent restaurant space to become one restaurant, new mechanical equipment snd 3 new skylighte.
Nycha dyckman houses, installation of temporary gas piping to connect (3) temporary mobile boiler trailers to provide heat during the heating season. no change in use, egress, or occupancy.
Proposed air conditioning system and ducwork
Replacement of complete existing central heat and air system with or without duct work Install replacement 2 Ton AC system
Supplemetal permit to 18010-10000-00355 to relocate the elevator machine room within the parking level.t*** - proposed location of the machine room needs to be approved by the mechanical plan checker.
Sc - 2019 cbrc - an interior tenant build-out within an existing 1-story retail building, per plans - existing restroom, mop sink & furnace to remain - exist rtu to be replaced with new, same size sam...