Search Building Permits
7,506 permits matching "hvac"
Lehman village boiler upgrade, structural modifications as per plans. no change in use egress or occupancy.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4bath]. Bldg 1
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton Heat Pump system
New single-story detached accessory structure 2 bed/2bath
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4bath]. Bldg 2
Installation of new steel dunnage on new roof for new HVAC units.
ePlan: Commercial Expedited Review - Remodel to Existing Jail Reception Area.
NYCHA BOILERS Dyckman: Building 5: Site/Civil work in relation to boiler replacement as per plans filed herewith
Interior alteration of an existing office space at bldg F.
Dyckman houses, installation of temporary boiler stacks, steam, condensate, make-up water piping connected to existing heating plant to provide heat during the heating season in conjunction with dob #...
SUPPLEMENTAL PERMIT TO #26016-70000-05258 TO REVISE WORK DESCRIPTION TO READ:1 Kitchen/1 Bathroom remodel for residential buildings (no structural changes)MECHANICAL, ELECTRICAL, AND PLUMBING INCLUDED...
Propose to install new boilers for the new building.
Replacement of complete existing central heat and air system with or without duct work
NYCHA DYCKMAN BOILERS:Building 6: Plumbing work in relation to boiler replacement as per plans filed herewith.
Finish out for admin office
NYCHA Boilers: Dyckman Building 5: Mechanical work associated with Boiler replacement as per plans filed herewith.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4bath] with Habitable Attic and Attached Garage.
Replacement of mini-split system Install replacement of mini-split system
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3 Ton Heat Pump
Ps 143m, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler and provide heat to the building. no change in use, egress, or occupancy.