Search Building Permits
5,430 permits · Roofing · NY
Installation of 82.8 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of 83.6 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of 84.4 kw solar energy system on roof. No change of occupancy, use or egress.
Demolition of roof tanks, installation of new sprinkler booster pump system, and modification to existing automatic sprinkler system.
Rooftop solar installation. no change to use, occupancy or egress.
Installation of solar panels, rooftop, grid tied, railed, 20 modules, 8.2 KW
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Replacement of cooling tower on the roof. no change to egress, use, or occupancy.
Proposed renovation of existing apartment with new partitions & finishes; removed abandoned vent on roof and seal up. no change in use, egress and occupancy.
Nycha throggs neck addition, bld. #30 - installation of approximately +/- 399 lf temporary heavy duty sidewalk shed, as per plans, for roofing replacement project. there will be no change to building...
Alteration of existing 3-story w/ basement and cellar residential building. change of use from a multi-family residential building to a 1-family residence. no increase in far. no changes to egress. ad...
Nycha throggs neck addition, bld. #30 - installation of +/-1489 lf of 8'-0h temporary chain link construction fence, as per plans, for roofing replacement project. there will be no change in buildingg...
Renovation of existing 2-family dwelling including new roof terrace
Roof replacement, Exterior masonry repair, Roof barrier and coping replacement, Interior finishes repair
Exterior facade repairs and waterproofing, brick replacement, lintel/spandrel repairs, sill repairs, pointing. No change in use egress or occupancy
Exterior facade repairs and waterproofing, brick replacement, lintel/spandrel repairs, sill repairs, pointing. No change in use egress or occupancy
Installation of hvac roof top units. no change in building use, occupancy and egress.
Exterior facade repairs and waterproofing, brick replacement, lintel/spandrel repairs, sill repairs, pointing. No change in use egress or occupancy
Installation of hvac roof top units as per plans herewith. no change in building use, occupancy and egress.
M276 - Selective interior and exterior repairs. replacement of roof top play area safety surface.