Search Building Permits
7,596 permits matching "hvac"
Addition and/or Alterations - Mechanical / Fuel Gas Permit for combo CP-2025-002257
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
Remove (1) oil tank and (1) boiler; Install (2) boiler, (2) H.W.H., (1) sump pump, (1) ejector pump, (1) lavatory and (1) water closet in the Cellar. No change in use, occupancy or egress.
Filing for replacement gas-fired hvac rooftopunit as per plans. no change in use, occupancy or egress.
Mechanical in conjunction with i1 for construction to install 4 split HVAC units with condensers on the roof; Bathroom and Utility Room Ventilation; Ceiling Hung Heaters
installation of a new wet pipe sprinkler system throughout building. install one (1) new boiler, one (1)1 hwh & one (1) new 2 350xl2 Wilkins lead free DCVA with one (1) new 2 combined water main from...
Existing boiler and heating piping removal. installation of new heat pump vrf system and associated piping. no change in use, egress, or occupancy.
Retrofit (1) existing combination gas/oil burner on (1) existing low pressure boiler. no change in means of egress use group or occupancy.
Relocate two (2) existing 275- gallon fuel oil storage tanks. install new oil-fired hot water heater as per plans. no change in use, egress or occupancy.
Replacement of existing boiler in existing boiler room in cellar in conjunction with restaurant renovation in cellar & first floor.
NYCHA BOILERS - DYCKMAN; Building 6 Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues and Boilers
NYCHA BOILER -Dyckman: Building 3. Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flue.
NYCHA BOILER -Dyckman. Building 3: Plumbing work in relation to boiler replacement as per plans filed herewith.
NYCHA Boiler- Dyckman: Building 2: General Construction work to include Sealant, firestopping, patching, wall repairs in relation to Boiler replacement as per plans filed herewith
NYCHA BOILERS Dyckman: Building8: Civil/Site work as per plans filed herewith. No change to use, egress or occupancy.
NYCHA Boilers: Dyckman: Building 6: General Construction in relation to boiler replacement as per plans filed herewith. No change to use, egress or occupancy.
NYCHA BOILER -Dyckman. Building 1. Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues and Boilers
NYCHA Boilers Dyckman: Building8; General Construction associated with boiler replacement as per plans filed herewith.
Direct replacement of rooftop hvac units
The scope of work is to file the operation of AC-1 as the heating and air conditioning unit for the residence.(this will allow CON-ED to reconnect the gas to allow the unit to heat, since it was disco...