Search Building Permits
7,596 permits matching "hvac"
Replace boiler and oil burner.
NYCHA BOILER -Dyckman. Building 1: General Construction associated with boiler replacement as per plans filed herewith.
NYCHA BOILER -Dyckman: Building 1. Civil/Site work in relation to boiler replacement as per plans filed herewith
Installation of new gas boiler in cellar apt 1E as per plans filed herewith. No change in use, egress and occupancy.
NYCHA BOILER: DYCKMAN. BUILDING 2: Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues and Boilers
NYCHA BOILER -Dyckman. Building3: Architectural work to include Sealant, firestopping, patching, wall repairs in rellation to Boiler replacement as per plans filed herewith.
Replacement of existing roof top HVAC unit with new. No Structural changes of existing dunnage. No change in use, egress, or occupancy.
Alteration to the existing building to add 2 new elevated steel mechanical platforms with stairs and guards and interior ceiling work (related to installation of new ducts)
INSTALLATION OF 2 TEMP. BOILERS WITHIN PROPERTY FOR USE DURING NEW BOILER INSTALLATION, IN CONJUNCTION WITH LAA# B01287237-I1. BOTH BOILERS (Temp-1 #40000205559N00011, Temp-2 #40000009281N1111) WILL B...
NYCHA BOILER -Dyckman. Building 5: General construction in relation to boiler replacement as per plans filed herewith.
Installation of two (2) new rooftop hvac units that connect to the existing supply / return infrastructure. there is a new fitout level air distribution network on level 4, which includes supply / ret...
Nycha boilers dyckman; building 7: plumbing work in relation to boiler replacement as per plans filed herwith.
NYCHA BOILERS Dyckman; Building 6: Site/Civil Work in relation to boiler replacement as per plans filed herewith.
NYCHA BOILER -Dyckman. Building 1: Plumbing work in relation to boiler replacement as per plans filed herewith,.
NYCHA Boilers: Dyckman Building 6: Mechanical work in association with boiler replacement as per plans filed herewith.
NYCHA BOILER -Dyckman. Building 8: Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues and Boilers
Replace boiler and gas/oil burner as per plans. no change in use, occupancy or egress.
NYCHA Boilers: Dyckman: Building Building4: Mechanical work associated with boiler replacement as per plans filed herewith.
NYCHA Boiler: Dyckman: Building 4: Architectural work to include Sealant, firestopping, patching, wall repairs in relation to Boiler replacement as per plans filed herewith
NYCHA BOILERS: DYCKMAN: Building 4: Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues and Boilers