Search Building Permits
5,430 permits · Roofing · NY
Rooftop solar installation. no change to use, occupancy or egress.
Installation of hvac roof top units as per plans herewith. no change in building use, occupancy and egress.
Roof replacement, Exterior masonry repair, Roof barrier and coping replacement, Interior finishes repair
Renovate apt units #s2 & #a3 on 3rd & 4th floor and common hallway from cellar to roof, including removal & installation new interior partitions, lighting, mechanical, plumbing & finish. no change to...
Mechanical systems alterations on the 1st thru 3rd floors, cellar, mezzanine, and roof levels in conjunction with proposed full building renovation; related work as per plans.
Installation of solar panels, rooftop, railed, grid-tied, 12 modules, 5.28kw
installation of solar panels, rooftop, railed, grid-tied, 7 modules, 2.87 KW
Rooftop solar installation. no change to use, occupancy or egress.
Installation of photovoltaic solar array on existing roof system as per plans
REMOVE EXISTING RTU & INSTALL (3) replacement SINGLE PACKAGE UNITS ON 2nd floor & 3rd floor ROOF with EXISTING ROOF DUNNAGE & DUCT WORK FOR 213-33 39 AVE LOBBY, SUITE 302 & 320
Installation of a 3-ton a/c unit at roof level. Make: York, Model #ZE03H10A2A..
Installation of solar panels, rooftop, grid tied, railed, 12 modules, 4.92 KW
Non-structural repair work to all exterior wall areas and localized roof sheathing that were removed during DEP-permitted asbestos abatement; no change to occupancy, use, egress, or structure.
Remove & replace roof drains, replace vent flashing, provide new floor drain & piping connection at cellar mech. rm. & provide new catch basin & piping to existing storm drain system line.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Installation of temporary overhead/roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Garage and roof repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Remove existing non-emergency DC generator and install new non-emergency 50kw natural gas generator on roof. Related plumbing filed under DOB # S00619708
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Nycha throggs neck addition, bld. #33 - installation of +/-1554 lf of 8'-0h temporary chain link construction fence, as per plans, for roofing replacement project. there will be no change in buildingg...