Search Building Permits
5,430 permits · Roofing · NY
Nycha throggs neck addition, bld. #32 - installation of +/-2279 lf of 8'-0h temporary chain link construction fence, as per plans, for roofing replacement project. there will be no change in buildingg...
installation of solar panels, rooftop, railed, grid-tied, 25 modules, 10.25 KW
Fire damage areas repairs, new finishes, framing repairs, roofing as per plans
Scope of work includes demolition of interior partitions at cellar through 4th floor and roof as indicated on plans. no change in use, occupancy or egress.
Renovation of existing 2-family dwelling including new roof terrace
Architectural alterations at 1st, 2nd floors and roof as indicated on drawings.
Installation of solar panels, rooftop, grid tied, railed, 14 modules, 5.74 KW
Solar tax installation of solar panels on roof. no change in use, egress, or occupancy.
Exterior facade repairs and waterproofing, brick replacement, lintel/spandrel repairs, sill repairs, pointing. No change in use egress or occupancy
Installation of photovoltaic solar array on existing roof system as per plans.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Repairs to facade and subgrade waterproofing, replacement of scuppers, replacement of exterior pads and stoop.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
PROPOSED MECHANICAL WORK FOR A SINGLE FAMILY BUILDING. WORK AT CELLAR, BASEMENT, 1st FLOOR TO 4th FLOOR & ROOFTOP. AS PER PLAN. IN CONJUNCTION WITH DOB NOW GC JOB#: B01278030-I1.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Removing existing walk in cooler and associated evaporator andcondenser and installation of two (2) new walk in coolers with new evaporators andcondensing units on roof.
Installation of material hoist on the roof. installation shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Replace condenser unit at roof as shown on plans filed herewith.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of solar panels on roof. no change in use, egress, or occupancy.