Search Building Permits
7,596 permits matching "hvac"
NYCHA BOILER -Dyckman. Building3: Architectural work to include Sealant, firestopping, patching, wall repairs in rellation to Boiler replacement as per plans filed herewith.
NYCHA BOILER -Dyckman. Building 5: General construction in relation to boiler replacement as per plans filed herewith.
Remove (1) oil tank and (1) boiler; Install (2) boiler, (2) H.W.H., (1) sump pump, (1) ejector pump, (1) lavatory and (1) water closet in the Cellar. No change in use, occupancy or egress.
NYCHA Boilers: Dyckman Building 6: Mechanical work in association with boiler replacement as per plans filed herewith.
Construct substantial alterations to commercial building occupy per plan. Mechanical Included this permit
Replacement of existing boiler in existing boiler room in cellar in conjunction with restaurant renovation in cellar & first floor.
NYCHA Boilers: Dyckman: Building Building4: Mechanical work associated with boiler replacement as per plans filed herewith.
NYCHA Boilers: Dyckman: Building 1: Mechanical work in relation to boiler replacement as per plans filed herewith. Replacing exhaust fan and adding a steam unit heater
Nycha boilers dyckman; building 7: plumbing work in relation to boiler replacement as per plans filed herwith.
Mechanical in conjunction with i1 for construction to install 4 split HVAC units with condensers on the roof; Bathroom and Utility Room Ventilation; Ceiling Hung Heaters
Interior remodel to existing admin offices (suites 300 and 400 - 2 apps)
installation of a new wet pipe sprinkler system throughout building. install one (1) new boiler, one (1)1 hwh & one (1) new 2 350xl2 Wilkins lead free DCVA with one (1) new 2 combined water main from...
NYCHA Boiler- Dyckman: Building 2: General Construction work to include Sealant, firestopping, patching, wall repairs in relation to Boiler replacement as per plans filed herewith
NYCHA Boiler Dyckman: Building 8 Mechanical work in association with boiler replacement as per plans filed herewith.
Relocate two (2) existing 275- gallon fuel oil storage tanks. install new oil-fired hot water heater as per plans. no change in use, egress or occupancy.
Retrofit (1) existing combination gas/oil burner on (1) existing low pressure boiler. no change in means of egress use group or occupancy.
NYCHA Boiler: Dyckman: Building 4: Architectural work to include Sealant, firestopping, patching, wall repairs in relation to Boiler replacement as per plans filed herewith
New 2-story 3 bedroom 2.5 bathroom dwelling unit with attached garage covered front porch rear covered patio and 2nd floor covered balcony.
Beeville 2980-HC201-L New 1-Story Single Family Residence with (3) bedrooms (2) bathrooms Attached Garage Covered Patio & Porch & Cafe
Scope of work will include Remove unused fuel oil and existing fuel oil tank and remove 2 existing steam boilers & burner''s .installation of New low pressure steam Boilers, and dual fuel burners , In...