Search Building Permits
5,397 permits · Roofing · NY
Proposed modifications to existing gas piping system (incl. gas meter) at basement level to building exterior to roof in pursuance of the new generator replacement filed under dob application no. q007...
R450_Remove exist blowers, exhaust fans on roof, and unit ventilators. Provide new Heating and Ventilation Units, roof mounted and interior exhaust fans, and unit ventilators. Add new interior exhaust...
Renovation of a kitchen and replacement of roofing. See mechanical and structural filings for additional work. Not change in uses, means of egress or occupancy under this application.
replacement of existing rooftop HVAC and split system air ac units and all new controls.
New railing installation at mechanical room roof, and brick masonry wall repair.
Exterior masonry, parapets, roof work & replacment of windows.
Mechanical work (direct replacement of (1)hvac roof top unit).**no change in use, occupancy, or egress is involved under this application**
Remove and install plumbing fixtures. install new rpz and 6 combined water service. install new sprinkler heads and fire department connection. work on floors 01-03 & roof. filed in conjunction with a...
These drawings and specifications are for the installation of 1 new rooftop unit, 1 heat pump unit, 7 air handling units, 3-bathroom exhaust fans and associated piping and ductwork.
Minor interior renovation to install new gypsum board and firestopping on top of exterior wall and roof. no structural or plumbing changes. no enlargements. filed to address ecb violation #039142773z
AT&T - Relocation of existing RRH units on the roof. All work is in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Direct replacement of (2) hvac rooftop units.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Installation of non-emergency gas fired generator with related gas booster pump on new steel platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Mechanical filing to obtain COC on roof-12th floors, to address multiple violations. No change in use, egress or occupancy.
In-kind replacement of (2) 5 ton 'trane' outdoor rooftop units and (1) 7.5 ton 'trane' outdoor rooftop units to sit on exist. dunnage on exist. roof of building 'a'
Installation of solar panels, rooftop, grid tied, railed, 17 modules, 6.97 KW
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Interior renovation inside existing retail space @ 1st fl to propose a take-out restaurant (burger spot). work to include refinish floor, new exhaust hood with related duct work and exhaust fan @ roof...
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.