Search Building Permits
5,396 permits · Roofing · NY
Install active ssds system included gravel trenches, slotted/solid pvc piping, manifolds, and accessories, above groud steel piping, roof mounted vent stack w fan. filed in conjunction with nb #421134...
Installation of solar panels on roof. no change in use, egress, or occupancy.
replacement of existing rooftop HVAC and split system air ac units and all new controls.
AT&T - Replacement of antennas on facade. Removal/replacement of antennas with removal/installation of RRH units on roof. Retrofit of cabinets in existing room in cellar. All work in compliance with T...
General construction modifications related to generator enclosure / noise mitigation screen on the 7th floor roof per plans. no change in use, egress, or occupancy.
Demo. & Install HVAC Ductwork, Rooftop Unit Controls, Supply Air Diffusers & Registers, Return Air Grilles, Restroom Exhaust Fan & Duct Within Retail Space on Part of 2nd Fl. & Replace Existing HVAC R...
Temporary roof protection as per drawings. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Relocation of cold water domestic distribution from roof to cellar. installation of pressure boosting system. no change in egress or occupancy.
Installation of PV sesten on existing roof no change to egress or use of occupancy
Installation of solar panels, rooftop, railed,grid-tied, 11 modules, 4.51kw
Replace one (1) packaged rooftop hvac unit on existing roof-curbs with new curb adapter as per plans. no change in use, egress or occupancy.
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
These drawings and specifications are for the installation of 1 new rooftop unit, 1 heat pump unit, 7 air handling units, 3-bathroom exhaust fans and associated piping and ductwork.
test
In-kind replacement of (2) 5 ton 'trane' outdoor rooftop units and (1) 7.5 ton 'trane' outdoor rooftop units to sit on exist. dunnage on exist. roof of building 'a'
Renovation of a kitchen and replacement of roofing. See mechanical and structural filings for additional work. Not change in uses, means of egress or occupancy under this application.
Installation of solar panels, rooftop, grid tied, railed, 22 modules, 9.02 KW
Installation of non-emergency gas fired generator with related gas booster pump on new steel platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Installation of photovoltaic solar array on existing roof system as per plans.
Installation of photovoltaic solar array on existing roof system as per plans