Search Building Permits
5,396 permits · Roofing · NY
Removal of existing asphalt roof shingles and replace with new at steep roofs. Removal of IRMA roofing and installation of SBS built-up roofing. Interior repairs and painting.
Installation of new VERIZON site on the roof. Install of 3 sectors (12 antennas) with associated parts, 6 RRH units, 3 GPS antennas, 3 OVP's and 1 equipment platform with cabinets. Related conduits on...
Installation of photovoltaic solar array on existing roof system as per plans.
General construction to renovate and rehabilitate fire damaged house of worship at first floor, roof, and facade. No change in use, egress, or occupancy.
Mechanical work (direct replacement of (1)hvac roof top unit).**no change in use, occupancy, or egress is involved under this application**
Installation of photovoltaic solar array on existing roof system as per plans.
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
Direct replacement of (2) hvac rooftop units.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
installation of solar panels, rooftop, railed, grid-tied, 19 modules, 7.79 KW
General construction related to the relocation of cold water domestic distribution from roof to cellar. installation of pressure boosting system. no change in egress or occupancy.
Installation of solar panels, rooftop, railed, grid-tied, 11 modules, 4.51kw
AT&T - Relocation of existing RRH units on the roof. All work is in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Installation of solar panels, rooftop, railed, grid-tied, 11 modules, 4.51kw
Installation of solar panels, rooftop, grid tied, railed, 17 modules, 6.97 KW
Installation of photovoltaic solar array on existing roof system as per plans
Replacement of split hvac system with a total capacity of 22,000 btu/h on the roof and floor 004. no change to egress, use, or occupancy.
Replacement of split hvac system with a total capacity of 7.5 tons on the roof and floor 008. no change to egress, use, or occupancy.