Search Building Permits
5,396 permits · Roofing · NY
installation of solar panels, rooftop, railed, grid-tied, 21 modules, 8.61 KW
PROPOSED PLUMBING WORK FOR A SINGLE FAMILY BUILDING. WORK AT OPEN SPACE, CELLAR, BASEMENT, 1st TO 4th FLOOR, AND ROOF. AS PER PLAN. IN CONJUNCTION WITH DOB NOW JOB#: B01278030-I1.
Scope of work alteration type 2 herewith filing a paa to include a rear balcony on 2nd floor and rooftop framed bulkhead constructed of rated walls and ceilings to be in compliance with bc 1509.2 no c...
Convert existing industrial use building to an office building as per plan. new flat roof to be built over existing roof and new stair bulkhead on roof. obtain new certificate of occupancy.
Installation of solar panels, rooftop, railed, grid-tied, 23 modules, 9.43kw
Installation of solar panels, rooftop, grid tied, railed, 18 modules, 7.38 KW
add new stucco, roof material gutters and eves, new brick at exterior, @ 1st and 2nd floor. add new dormer and windows @ attic. existing roof finish to be replaced . Window to be replaced @first floor...
Exterior work: terra cotta restoration, brick replacement, pointing, new railings installation, roof slab repairs & roof replacement as per plan. no change in use, egress or occupancy.
Masonry restoration, roof replacement, waterproofing installation, lintel replacement, windowreplacement, masonry repair, installation of vct tile, and pv panel installation.
Replace windows and exterior siding at Penthouse unit. New waterproofing and insulation where siding is to be replaced. Enlarge 2 window openings. Filed in conjuction with job#M01155272 I1, S1, S5. NO...
installation of solar panels, rooftop, railed, grid-tied, 21 modules, 8.61 KW
Temporary removal of windows associated with Waterproofing and flashing around window and PTAC openings and surrounding exterior surfaces as per plans filed herewith. No change to occupancy, use or eg...
Sprinkler modifications taking place on the 9th floor, 9th floor mezzanine and roof as per drawings filed herewith. no change in use, egress or occupancy.
The work is masonry restoration and lintel/spandrel waterproofing at the east facade, and at the at the west mechanical roof level and pump room roof level roofs (for the masonry work at the parapets)...
Providing roofing replacement, parapet replacement including 14th floor exterior facade work from 14th floor lintel to roof level and rooftop structure repairs and entrance canopy roofing.. Replace 1s...
INSTALLATION OF 300 psf SIDEWALK SHED, OVERHEAD PROTECTION, ROOF PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR...
Northwell Health - LINAC Replacement: modify Mechanical infrastructure @ portion of 1st floor & roof, in conjunction with Linear Accelerator equipment replacement, including replacement of existing ro...
Decommission of existing T-MOBILE site on the roof. No change in use, egress or occupancy.
Create dormers and reconstruct main roof.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy