Search Building Permits
5,396 permits · Roofing · NY
Exterior Temporary Removal of facade and standing seam metal roof panels to remove existing concrete vault filed under application# S01295433-I1.
Installation of solar panels, rooftop, grid tied, railed, 16 modules, 6.56 KW
Masonry replacement and waterproofing per plans. no change in use, occupancy or egress.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
9th floor & Roof. Demo. existing exhaust fan at 9th floor window, install condensing unit, and associated fan coil units as per plans.
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
installation of solar panels, rooftop, railed, grid-tied, 5 modules, 2.05 KW
INSTALLATION OF 300 psf SIDEWALK SHED, OVERHEAD PROTECTION, ROOF PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR...
Masonry restoration, roof replacement, waterproofing installation, lintel replacement, windowreplacement, masonry repair, installation of vct tile, and pv panel installation.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Exterior work: terra cotta restoration, brick replacement, pointing, new railings installation, roof slab repairs & roof replacement as per plan. no change in use, egress or occupancy.
Scope of work alteration type 2 herewith filing a paa to include a rear balcony on 2nd floor and rooftop framed bulkhead constructed of rated walls and ceilings to be in compliance with bc 1509.2 no c...
The work is masonry restoration and lintel/spandrel waterproofing at the east facade, and at the at the west mechanical roof level and pump room roof level roofs (for the masonry work at the parapets)...
Temporary removal of windows associated with Waterproofing and flashing around window and PTAC openings and surrounding exterior surfaces as per plans filed herewith. No change to occupancy, use or eg...
Create dormers and reconstruct main roof.
Replacement of 5 hvac units on floor 001 and the roof with a total capacity of 29 tons. no change to egress, use, or occupancy.
add new stucco, roof material gutters and eves, new brick at exterior, @ 1st and 2nd floor. add new dormer and windows @ attic. existing roof finish to be replaced . Window to be replaced @first floor...
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Structural work filed for partial demolition of 2nd floor of existing 2-story building with roof.
Alterations to the existing curtain wall system at the setback roof terraces. New door assemblies and structural supports integrated into the existing curtain wall system as shown on drawings filed he...