Search Building Permits
5,472 permits · Roofing · NY
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Rear yards & court yards facades restoration: 65% pointing, 30 windwos sill repair, recaulking all windows, scrape, prime & paint fire escapes assembly & provide two coats of waterproof thoroseal as p...
Space # 2058: d1- new store front opening and steel support for two rooftop ac units. no change in use, egress or occupancy.
Fire restoration of one-story building for stores 740 & 742. Replace damaged interior ceiling, roof joists, roll down gates & repair roof as per plans. To resolve DOB violations 082825CER01CR & 082825...
Installation of pv system on existing rooftop. no changes to egress or use of occupancy.
Installation of solar panels, rooftop, grid tied, railed, 6 modules, 2.46 KW
Application filed herewith to remove vertical extension at top of building with wood structural and proposed roof terrace (2) two story with cellar, (2) two family building.no change in use, egress or...
Installation of temporary roof protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
installation of solar panels, rooftop, railed, grid-tied, 8 modules, 3.28 KW
Exterior Modernization of existing school building. Replacement of exterior brick veneer with terracotta rain screen system, replacement of roofs, replacement of exterior doors, partial replacement of...
installation of solar panels, rooftop, railed, grid-tied, 10 modules, 4.1 KW
Providing roofing replacement, parapet replacement including 14th floor exterior facade work from 14th floor lintel to roof level and rooftop structure repairs and entrance canopy roofing.. Replace 1s...
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of solar panels, rooftop, grid tied, railed, 46 modules, 20.24 KW
Repair of exterior masonry, parapets and roofing. repair of interior floor on the first floor and related interior work.
Structural work filed in conjunction with the change from a three family to a one family dwelling. Framing for rear porch, enlarged openings in masonry, exterior walls, changes to load bearing interio...
Bard High School: Remove & replace section of cafeteria floor for plumbing work. Fencing over openings in parapet wall. Crossover at pipes at roof, repair front balcony, repair at auditorium egress st...
Filing to replace in kind of packaged rooftop HVAC unit on existing steel dunnage and respond ECB violations.
AT&T - Replacement and relocation of antennas with installation and removal of RRH units on roof. Retrofit of cabinets and removal of RRH units on existing platform on roof. All work in compliance wit...
Plumbing work related to roof replacement and exterior modernization