Search Building Permits
9,369 permits matching "hvac"
Lobby renovation, new hvac system integration, and front steps& portico repair and restoration. related ms, pl, and st filed separately. no change in use, egress, or occupancy.
Installation of variable refrigerant flow (vrf) hvac system serving apt 11-ef including minor partition work, new dropped ceilings and soffits to accomodate new lighting.
Remove and replace ceiling on cafeteria alongside first, second, and third floor corridors. Remove portions of exterior wall for HVAC access. Install new partitions in cellar to make new rooms. Replac...
SB 4th Fl:: Modifications of HVAC equipment and ductwork to accommodate alterations within the existing building as per plans filed herewith only.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Interior renovation of cellar basement and 1st floor of existing 2 story building. demolition and construction work as per plan. install new hvac, partition, flooring, ceiling and painting throughout....
Replacing the HVAC Units.
Replacing the HVAC Units.
Modifications to the existing HVAC system on the 14th & 15th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
To install new ductworks and air devices throughout the space and connect to existing HVAC units and Mechanical work for the exhaust hood in the commercial kitchen of an eating and drinking establishm...
Hvac as per plan
Install (5) ductless hvac split systems and (1) ducted heat pump split systems
Installation of variable refrigerant flow (vrf) hvac system serving apt 11-ef including minor partition work, new dropped ceilings and soffits to accomodate new lighting.
Remove and replace ceiling on cafeteria alongside first, second, and third floor corridors. Remove portions of exterior wall for HVAC access. Install new partitions in cellar to make new rooms. Replac...
Modifications to the existing HVAC system on the 14th & 15th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Lobby renovation, new hvac system integration, and front steps& portico repair and restoration. related ms, pl, and st filed separately. no change in use, egress, or occupancy.
Interior build-out to existing retail space in type 1a construction building. proposed occupancy class b (barber shop). new interior partitions and existing toilets will remain as is. new plumbing, el...
Install (5) ductless hvac split systems and (1) ducted heat pump split systems
Installation of variable refrigerant flow (vrf) hvac system serving apt 11-ef including minor partition work, new dropped ceilings and soffits to accomodate new lighting.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.