Search Building Permits
8,851 permits · HVAC
Remodel to enclose outdoor space at existing bar DA-2021-1501
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...
Modifications to the existing HVAC system on the 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
ePlan Review: New Shell Addition to Existing Hotel
***SEE COMMENTS***ePlan: [CORE & SHELL ONLY] WORK TO CORE & SHELL UNDER 19010-10000-05418 TO INSTALL 1-HR FIRE RATED DEMISING WALL TO DIVIDE INTO (2) TENANT SPACES "UNIT B1" (826 SF) AND "UNIT B2" (1,...
New construction of SFR Condo with 3 beds 2.5 baths porch (temporary office to garage area will convert back to garage before occupation) PUD
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Replace current system with new 3 ton variable speed Ecoer system. New EOD heat pump condenser and EAH air handle...
Mobile Home installed with deck
Modifications to building HVAC system on floors 27-29 (Construction designation) / 30-32 (Marketing designation)
This application is filed for the installation of 12 shower , 12 lavatory , 12 toilet , 14 sink , 2 hot water heaters , 2 boilers and 2 gas meters in conjunction with alteration application #x00973158...
This application is filed for the installation of 14 toilets , 14 lavatory ,14 shower , 13 sink , 1 dishwasher , 2 hot water heater , 2 gas boilers, 2 gas meters in conjunction with alteration applica...
ePlan: Commercial Expedited Review - Interior and Exterior Remodel of Existing Church. New HVAC Electrical Fixtures New Bathroom Plumbing Upgrades Framing Additions; Structural and Non-Structural Door...
ePlan: Commercial Expedited Review - New 4-Story Storage Facility (105020 SF).
Install new gas piping from existing gas meter to new boiler.
Modifications to the existing HVAC system on the Cellar, 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Installation of a new boiler and a new burner to create a mobile boiler trailer unit # 100-04-24. no change in use, egress, or occupancy.
Gas connection to replacement gas boilers.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3 Ton AC with furnace and coil
Modifications to existing HVAC system & related piping. No change in use, egress or occupancy.