Search Building Permits
8,851 permits · HVAC
Replacement of complete existing central heat and air system with or without duct work
Gas connection to replacement gas boilers.
Interior finish out of a first generation office space consisting of Suite 300 and a common corridor (FLR3)
Herewith filing plumbing modifications for boiler replacement. No change in use, egress, or occupancy.
Replacement of complete existing central heat and air system with or without duct work Replace current system with new 3.5 ton multi-stage Goodman system (AC Furnace and Coil) and includes return duct
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3 Ton AC with furnace and coil
Register (2) existing boilers, (2) range/ovens and (2) dryers.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 Ton Horizontal Gas System
ePlan: Commercial Expedited Review - New 4-Story Storage Facility (105020 SF).
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 5 Ton Two Stage Horizontal Gas System
ePlan: Commercial Expedited Review - Interior and Exterior Remodel of Existing Church. New HVAC Electrical Fixtures New Bathroom Plumbing Upgrades Framing Additions; Structural and Non-Structural Door...
Mobile Home installed with deck
***SEE COMMENTS***ePlan: [CORE & SHELL ONLY] WORK TO CORE & SHELL UNDER 19010-10000-05418 TO INSTALL 1-HR FIRE RATED DEMISING WALL TO DIVIDE INTO (2) TENANT SPACES "UNIT B1" (826 SF) AND "UNIT B2" (1,...
Residential interor remodel. Replace all original internal wiring and outlets from current 200amp service. Replace all original galvanized plumbing install hvac system. Remove/cap all gas service in h...
ePlan Review: New Shell Addition to Existing Hotel
Replace existing Tub with a shower, lavatory and toilet with new ones, low pressure gas boiler, hot water heater with a new gas combi boiler, relocate and replace washer and dryer with new ones as per...
This application is filed for the installation of 14 toilets , 14 lavatory ,14 shower , 13 sink , 1 dishwasher , 2 hot water heater , 2 gas boilers, 2 gas meters in conjunction with alteration applica...
*GREEN BUILDING* New construction single-family residential 1-story 3 bedroom 3.5 bath with attached 2-car garage covered front porch and covered rear patio.
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...