Search Building Permits
7,001 permits · HVAC
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations...
Complete HVAC system replacement. Existing gas fired RTU's to be replaced with DOAS/VRF HVAC system. DOAS to be air source heat pump with backup electric heat. VRF system to be split system with air s...
Herewith filing to refurbish existing chillers, replace condensor water piping and upgrade the HVAC controls as per the drawings. No change in use, egress or occupancy.
Nycha boiler - removal and replacement of plumbing fixtures and associated piping for interior renovation of mechanical equipment room.
Plumbing for new boiler and water heater in cellar
Mechanical per plan
HVACSFR
Plumbing work related to boiler replacement. no change in use, egress, or occupancy.
3 new gas boilers in conjunction with nb m00798756-i1
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Nycha boiler - removal and replacement of vacuum pump unit, condensate return unit with mechanical piping and duct-work for interior renovation of mechanical equipmentroom.
Installation of 2 ton air conditioning unit on the 7th Floor. No change in use egress and occupancy.
Installation of one (1) new gas boiler. all work as per plans filed herewith. no change in use, egress, or occupancy.
Application file to exist. chimney remove and replace new double wall stainlesssteel exterior chimney from basement-boiler room to be extended 4 feet above parapet wall as per plan. hpd omo#no change...
Modifications to the existing HVAC system on the 31st - 33rd Floors, as per plans. No change to use, egress, or occupancy.
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new combi. boiler on 2nd floor;new 2-pc restroom, washer, dryer, combi. boiler and hot water...
Proposed interior renovation for a nail spa and installation of nail ventilation system and air conditioner system in unit#601,#603 on the sixth floor as per plan. no change in use, egress oroccupancy...
Proposing Installation of (2) 10 ton indoor air systems, ductwork, and associated apparatus, remote Condensing Units for refrigeration & ice mach.,,, Pollution control exhaust unit, Exhaust Fans , Gas...
Modifications to the existing HVAC System and relocation of ductwork on the 7th Floor as per plans (Hines - Demising Wall.) No change to use, egress or occupancy.