Search Building Permits
9,406 permits matching "hvac"
Pizarro S414 A Right New - 1 Story SFR w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
New construction two-unit residential 3-story 3 bedroom w/ office 2.5 bath with attached 2-car garage rear covered patio uncovered wood deck 2nd floor covered deck and 3rd floor uncovered deck;
Replacement of complete existing central heat and air system with or without duct work Like for like replacement of 3 ton Gas furnace upflow system
Installing a central air conditioning system with horizontal air handling units, four condensing units, replacing living room PTAC units, relocating the kitchen vent riser, and adding a downdraft vent...
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3.5 Ton Horizontal Gas System
Tenant finsh out creating restaurant with outdoor seating/bar area
Esparanza S426 C Left New - 1 Story SFR w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Stationary Gantry Crane Installation in an Existing Lab Space
CHANGE OF USE from Pharmacy to Personal Services including an Interior Remodel 2025 092454 DA - Approved
Replace gas fired boiler.
Install two direct vent gas boilers.
Installation of one new gas fired hot water boiler
Install three new thru-wall air conditioning units in the living room and bedrooms. no change in use, occupancy or egress.
Filing herewith plans and application to cap & remove boiler, hwh in cellar. new (2) piece bathroom lav, toilet in cellar, (3) piece bathroom lav, toilet, w.c in 2nd flr. new (1) new washer,(1) electr...
Install two gas fired boilers.
Renovation of HVAC system on 1st, 2nd, and roof as related to office renovation in MAIN ADMINISTRATIVE BUILDING. No change in use, egress, or occupancy.
Replacement 5,000 gallon oil tank.