Search Building Permits
8,821 permits · HVAC
Replace air handling units 5a and 5b
adding attic ducted ac system
Replace Boilers 20000077100Y0001, 20000077100Y0002, 20000077100Y0003 & 20000077100Y0004 & associated pumps, valves. Remove Boilers 20000077100Y0005, 20000077100Y0006, 20000077100Y0007 & 20000077100Y00...
Abandon existing buried 7,500-gallon fuel oil storage tank as per plans. no change in use, egress or occupancy.
Install floor drain replace plumbing fixturein existing roughingremove hand sink grease trup and boiler
Application to modify an existing commercial space, for the construction and the mechanical (hvac) work of this deli-store (u.g. 6), including the commercial cooking system (only hood, ducts & exhaust...
Installation of plumbing system for entire building in conjunction with alt-1 filings M01298299, M01298287. Removal of gas line & fixtures - specifically 2 gas water heaters & 1 boiler that were filed...
Installation of new Domestic HWHs, pumps & valves to replace Boilers 20000077100Y0005, 20000077100Y0006, 20000077100Y0007 & 20000077100Y0008. Install new sump pump (cel) at elevator hoistway and in tr...
Nycha boiler - removal and replacement of vacuum pump unit, condensate return unit with mechanical piping and duct-work for interior renovation of mechanical equipment room.
File MECH work for eating and drinking establishment at 001 and access, use at cellar for new HVAC , commecail kichen hood , axhaust , ductwork , fans ect as per plans
Install 2 boilers, 2 water heaters and all associated piping.
Hvac refresh
Filing herewith to relocate fuel storage for generator as per plans (relocation to sidewalk for construction purposes only)
Reconfiguring existing hvac system including new return air grilles, exhaust, relocating thermostats.
NYCHA BOILER- BLDG 6 - Architectural work being filed in conjunction with Cooper Houses and all related applications.
Installation of HVAC equipment for 233rd Street Pumping Station NYC DEP Capital Project WP-269 PS-DES-2.
1st fl. commercial establishment. erect minor interior partitions, new finishes thru-out, new hung ceiling. new plumbing, hvac filed separately. no change in egress, occupancy, or use filed under this...
Install replacement boiler and gas burner as per plans. no change in use, occupancy or egress.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Early start demo to existing retail. Removal of interior non load bearing partitions, ceilings, plumbing, electrical, and mechanical systems, but not including fire sprinklers or other fire safety sys...