Search Building Permits
8,821 permits · HVAC
Installation of plumbing system for entire building in conjunction with alt-1 filings M01298299, M01298287. Removal of gas line & fixtures - specifically 2 gas water heaters & 1 boiler that were filed...
1st fl. commercial establishment. erect minor interior partitions, new finishes thru-out, new hung ceiling. new plumbing, hvac filed separately. no change in egress, occupancy, or use filed under this...
For permit 100823405(original)/101076807(reinstatement): replacement general contractor. replacement electrical contractor. replacement plumbing contractor. replacement other (hvac) contractor. new co...
Installation of plumbing system for entire building in conjunction with alt-1 filings M01298299, M01298287. Removal of gas line & fixtures - specifically 2 gas water heaters & 1 boiler that were filed...
Install replacement boiler and gas burner as per plans. no change in use, occupancy or egress.
Expansion of current office space; no corrections or changes to the current site plan; no additional work in warehouse - Suite 101
ePlan: Grading and site improvements for excavation and installation of concrete vaults housing mechanical equipment underground.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 Ton Horizontal Heat Pump System
Install floor drain replace plumbing fixturein existing roughingremove hand sink grease trup and boiler
Replacement of hvac units for existing office at 019 fl & penthouse. work includes removal of old cooling tower unit at penthouse and installation of new hvac (vrf) system at 019 fl as per plans herew...
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Replacement (2) combination gas/oil burners on (2) existing low pressure boilers. no change in means of egress use group or occupancy.
1 Story Single Family House. New Septic system. No additional dwelling units. (ETJ and full purpose jurisdictions-work being done on full purpose side of lot)
Patch and repair ceilings on first floor and mezzanine level to modify smoke control system per mechanical permit (21044-10000-27915)
Construct alterations for child care restroom first floor north end of existing institutional building per plan. Mechanical included.
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system with ductwork
Relocate 900 sq. ft. 1-story 1 bedroom 1 bathroom dwelling from Uhland TX to 908 E 13th St Austin. Addition to side of structure for total of 2 bed 2 bath. Scope of work will result in a 3 unit use.
This is not for the office of complex. No unit number. Replacement of complete existing central heat and air system with or without duct work Replacing the current 4 ton indoor and outdoor HVAC system...
NYCHA BOILER- BLDG 6 - Architectural work being filed in conjunction with Cooper Houses and all related applications.
Nycha boiler - removal and replacement of vacuum pump unit, condensate return unit with mechanical piping and duct-work for interior renovation of mechanical equipment room.