Search Building Permits
7,092 permits · HVAC
Replacement of furnace only Change out 2.0 Ton W/ Gas Furnace Economy Replacement
Mechanical modifications in boiler room for alteration of existing boiler combustion air as per plans filed herewith. no change in use, egress or occupancy.
Replacement of complete existing central heat and air system with or without duct work Install replacement of a 3 ton two stage Goodman system. New GLXT7 condenser and upflow coil on R32 refrigerant w...
Replacement of complete existing central heat and air system with or without duct work Replacement of 4T heat pump like-for-like equipment; no structural change
Abilene S402 A Right New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Installation of new Boiler system, HVAC System and Make up air unit for existing House of Worship. No change of use, egress or occupancy under this application. See comment#24
Application for mechanical (hvac) work in conjunction with alteration-1 change of use/occupancy, vertical enlargement, and interior/exterior renovation.
Replace HVAC unit for Chase Bank. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the Cellar floor (Harry Winston - Cellar Fitout) as per plans. No change to use, egress or occupancy.
Replacement of furnace only 2.0 Ton W/ Gas Furnace Economy Replacement
Self-cert 2019 cbrc: interior alteration of an existing 4-story four unit brick apartment building including new hvac and plumbing systems and electrical upgrades. damged floor joists and subflooring...
1360al new 1 story 3 bedroom 2 bath single family residential home with attached garage covered front porch and rear patio
Replacement of complete existing central heat and air system with or without duct work
Self-cert 2019 cbrc: interior alterations only to existing 2 story sfr with basement. work includes reconfiguration of 1st floor kitchen, installation of new powder room. also includes cabinetry, fixt...
Mechanical work for installation of two gas furnaces, gas piping filed under dob now #b01317311-i1.
Installation of two new gas furnaces, one new hot water heater in cellar, and associated piping. no change in use, occupancy, or means of egress
Renovation of existing corridor and restrooms on the 9th floor. No exterior work. No access control.
[ePlan]Supplemental to 25014-10000-02625 to Revise T24 to utilize a mini-split system in lieu of a central HVAC system in the ADU.
Installation of new hvac system associated with nb application filed under initial filing
Addition/remodel. Addition of 145 sf to existing noncomplying 1-story single family residence for the expansion of existing primary bathroom and closet with addition of new storage area. Remodel guest...