Search Building Permits
7,506 permits matching "hvac"
Addition and/or Alterations - FOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED...
Addition and/or Alterations - FOR A MECHANICAL WORK AT THE ROOF LEVEL OF AN EXISTING STRUCTURE.** ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO TH...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations...
RENOVATION OF EXISTING CELLAR WITH PLUMBING WORK AS PER PLAN: REPLACE WASHER, DRYER AND BATHROOM; NEW (4)COMBI. BOILERS AND (1)HOT WATER HEATERS iN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER...
New rooftop HVAC unit for service of addition and modification of existing systems in areas at point of connection to addition and also impacted by accessibility scope of work
Installation of rooftop HVAC equipment, kitchen exhaust ducts and fans, associated with new supermarket on ground floor. No change in egress, use or occupancy
Plumbing associated with boiler replacement
New Heating Systems, Ventilation Systems, Air Conditioning Systems and Associated Ducts and Piping to accommodate Arch Plans.
NYU - Infrastructure Package - INSTALLATION LOCATION OF BOILERS, BOILER CALCULATIONS, SCHEDULES, DETAILS AND CONTROLS.
Install new commercial kitchen ventilation at cellar to roof. New commercial HVAC system for new/existing eating or drinking est. at all floors. Filed in conjunction w/ M00981006, M00976389, M00975890...
Application file to interior renovation as sheetrock, floor tiles, ceiling, boiler room enclose and meter room repair by cmu block at cellar. remodeling steps at rear yard at cellar floor. remove viol...
Proposed installation of air conditioner system as per plan. no change in use, egress or occupancyunder this application.
Proposed filing for Boiler Replacement.