Search Building Permits
7,596 permits matching "hvac"
Plumbing associated with boiler replacement
Proposed filing for Boiler Replacement.
Install new (2)boilers and (2)hot water heaters in basement as per plan; no change in use, egress or occupancy under this application.
File boiler equipment work type to register 6 combination unit as per plan in conjunction with plumbing work#b01345079-s1 as per plan no change of use, egress, or certificate of occupancy.
Remove existing computer room air conditioning unit, condensate pump, drip pan, and all supports.remove existing chilled water heat exchanger, pumps, expansion tank, air separator, and chemical feeder...
Replacement (1) new low pressure boiler. replacement (1) new gas burner. straight gas only. no change in means of egress use group or occupancy.
Replace three ton split air conditioning system.
Replacement of complete existing central heat and air system with or without duct work Replace current system with new 2 ton single stage Goodman system. New GLZS4 heat pump condenser and AMST air han...
Replacement of complete existing central heat and air system with or without duct work UPSTAIRS ONLY
New 2-story 4 bedroom 3.5 bathroom dwelling unit with attached garage covered front porch and rear covered patio.
Remove existing computer room air conditioning unit, condensate pump, drip pan, and all supports.remove existing chilled water heat exchanger, pumps, expansion tank, air separator, and chemical feeder...
Construct tenant improvement throughout a commercial office building per plans mechanical included
Interior alteration of existing common restrooms.
Adding roughly 1100 square feet of livable space to existing single-family home. Addition includes 3 new bedrooms 2 new bathrooms and remodeling existing front door and entry way.
Replacement of complete existing central heat and air system with or without duct work
Adding hood vent to location there is already a current MP with another contractor on file. (2024-084067 MP) We are only doing the hood vent. secondary contractor
Replacement of complete existing central heat and air system with or without duct work
Install new commercial kitchen ventilation at cellar to roof. New commercial HVAC system for new/existing eating or drinking est. at all floors. Filed in conjunction w/ M00981006, M00976389, M00975890...
Addition and new bathroom. Cosmetic updates to the existing structure new attached carport and addition of extra driveway space. ***Install new plumbing in the hallway bathroom and kitchen and install...
Replacement of complete existing central heat and air system with or without duct work Replacement of two (2) chilled water air handlers. AHU-4N and AHU-4S serving 4th floor of building A. are replaci...